CASE STUDY
Type 4 Cascades

Two Type 4 composite cascades built and delivered in Rajasthan

Bikaner & Tonk, RajasthanManufacturing, supply, delivery & handover
Cascades
2 × Type 4
Status
Handed over
Read case study
CASE STUDY
CNG Station Commissioning

Commissioning a CNG station in Rajkot, from tubing to handover

Rajkot, Gujarat · Gwalior, M.P.Commissioning, HP tubing & interconnection
Connected
Compressor, LCV, dispenser
Status
Operational
Read case study
CASE STUDY
CNG/CBG Cascades

50+ cascades supplied, installed and commissioned across three states

Vijayawada · Hyderabad · BhopalSupply, installation & commissioning
Cascades
50+
Status
Operational
Read case study
CASE STUDY
HP Tubing & LCV Fill Posts

High-pressure tubing and LCV fill posts commissioned at a biogas plant in Nellore

Nellore, Andhra PradeshHP tubing, manifolds, LCV fill posts & commissioning
Scope
Tubing, manifolds, fill posts
Status
Commissioned
Read case study
CASE STUDY
High Pressure Tubing, Installation and Commissioning

CNG/CBG Plant: 4500WL CNG Cascade Supply, installation and commissioning

Surat, GujaratSupply, HP tubing, installation & commissioning
Equipment
4500 WL Type 1 CNG Cascade
Read case study
CASE STUDY
Supporting Reliable CNG Vehicle Refuelling Through Engineered Gas Infrastructure

LCV Fill Post – Single Arm Supplied to Hardoi, Uttar Pradesh

Hardoi, Uttar PradeshEquipment supply
Equipment
LCV Fill Post – Single Arm
Read case study
CASE STUDY
Delivering Integrated CNG Storage and Vehicle Refuelling Infrastructure — From Supply to Successful Commissioning

4500 WL CNG Cascade Single Bank & LCV Fill Post Single Arm Supplied to Pilibhit, Uttar Pradesh

Pilibhit, Uttar PradeshSupply, HP tubing, installation & commissioning
Equipment
4500 WL Single Bank Cascade & Single Arm LCV Fill Post
Read case study
CASE STUDY
Integrated Equipment Supply, High-Pressure Tubing, Installation & Commissioning for Gas Infrastructure

CNG/CBG Plant Infrastructure Execution at Lakhimpur Kheri, Uttar Pradesh

Lakhimpur Kheri, Uttar PradeshSupply, HP tubing, installation & commissioning
Equipment
CNG/CBG plant equipment
Read case study
CASE STUDY
Integrated CNG Storage and Vehicle Refuelling Infrastructure — From Equipment Supply to Testing, Commissioning & Handover

Two 4500 WL CNG Cascades & One LCV Fill Post Supplied to Surat, Gujarat

Surat, GujaratSupply, HP tubing, installation & commissioning
Equipment
2 × 4500 WL CNG Cascades & 1 LCV Fill Post
Read case study
CASE STUDY
Equipment Supply | High-Pressure Tubing | Installation & Commissioning

3 × 4500 WL CNG Cascades & One LCV Fill Post Supplied to Nagpur, Maharashtra

Nagpur, MaharashtraSupply, HP tubing, installation & commissioning
Equipment
3 × 4500 WL Single Bank Cascades & 1 LCV Fill Post
Read case study
CASE STUDY
Equipment Supply | High-Pressure Tubing | Installation & Commissioning I Handover

Type 1 CNG Cascade – 3000 WL Supplied to Chunar, Uttar Pradesh

Chunar, Uttar PradeshSupply, HP tubing, installation & commissioning
Equipment
3000 WL Type 1 CNG Cascade
Read case study
CASE STUDY
CNG/CBG Plant Infrastructure — Equipment Supply, High-Pressure Tubing, Installation, Commissioning & Handover

CNG Cascade – 4500 WL, Odorizer & LCV Fill Post Supplied to Rae Bareli, Uttar Pradesh

Rae Bareli, Uttar PradeshSupply, HP tubing, installation & commissioning
Equipment
4500 WL Cascade, Odorizer & LCV Fill Post
Read case study
CASE STUDY
Supporting CNG/CBG Infrastructure Through Reliable Gas Storage Equipment Supply

4500 WL CNG Cascade Supplied to Shahjahanpur, Uttar Pradesh

Shahjahanpur, Uttar PradeshEquipment supply
Equipment
4500 WL CNG Cascade
Read case study
CASE STUDY
High-Pressure Tubing, Installation & Commissioning for CNG/CBG Plant Infrastructure

5400 WL CNG Cascade at Ballarpur, Chandrapur, Maharashtra

Ballarpur, Chandrapur, MaharashtraSupply, HP tubing, installation & commissioning
Equipment
5400 WL CNG Cascade
Read case study
CASE STUDY
High-Pressure Tubing, Installation & Commissioning for CNG/CBG Plant Infrastructure

5400 WL CNG Cascade Supplied to Mathura, Uttar Pradesh

Mathura, Uttar PradeshSupply, HP tubing, installation & commissioning
Equipment
5400 WL CNG Cascade
Read case study
CASE STUDY
Supporting CNG/CBG Plant Infrastructure with High-Capacity Gas Storage Solutions

3 Nos. 4500 WL Type 1 CNG Cascades Supplied to Saharanpur, Uttar Pradesh

Saharanpur, Uttar PradeshEquipment supply
Equipment
3 × 4500 WL Type 1 CNG Cascades
Read case study
BLOG
CBG Policy

SATAT Scheme: Accelerating India’s Compressed Biogas (CBG) Ecosystem

Urjika Engineering Team4 min read
Read article
BLOG
Safety & Regulation

PESO vs OISD vs PNGRB

Urjika Engineering Team6 min read
Read article
BLOG
Fittings & Materials

SS316 vs SS304 Fittings in Oil & Gas Applications

Urjika Engineering Team5 min read
Read article
BLOG
CGD Careers

Understanding PNGRB and Its Influence on Career Growth in India’s CGD Industry

Urjika Engineering Team3 min read
Read article
BLOG
Piping Basics

PN16 vs Class 150: Understanding Pressure Ratings in Industrial Piping Systems

Urjika Engineering Team3 min read
Read article
BLOG
CGD Industry

Understanding India’s Major Natural Gas Companies: GAIL, IGL, MGL, Adani Total Gas & Torrent Gas

Urjika Engineering Team6 min read
Read article
BLOG
CBG Plant Solutions

Beyond Gas Upgradation: Integrated High-Pressure Solutions for CBG Projects

Urjika Engineering Team4 min read
Read article
BLOG
Engineering Basics

Understanding Pressure Units: mBar, Bar, Gauge Pressure & Absolute Pressure

Urjika Engineering Team4 min read
Read article
BLOG
CGD Industry

Understanding CGD Licenses: Why Geographical Areas Are Valuable in India’s Gas Industry

Urjika Engineering Team6 min read
Read article
BLOG
Gas Quality

Gross Calorific Value (GCV) vs Net Calorific Value (NCV): Understanding the Energy Content of Gas

Urjika Engineering Team4 min read
Read article
BLOG
CGD Industry

Understanding India’s Natural Gas Ecosystem: Who Controls What?

Urjika Engineering Team6 min read
Read article
BLOG
Cascades

CNG Cascade Capacity: Understanding Design Capacity vs. Actual Gas Delivery

Urjika Engineering Team5 min read
Read article
BLOG
Gas Measurement

SCM vs Sm³ vs Nm³: Why Is PNG Billed in Volume While CNG Is Sold by Weight?

Urjika Engineering Team6 min read
Read article
BLOG
Gas Basics

CNG, PNG, CBG & CGD: Understanding India’s Gas Ecosystem and How Gas Reaches the Market

Urjika Engineering Team7 min read
Read article
BLOG
CGD Careers

Why Mechanical Engineers Must Understand Gas Contracts Before Joining a CGD Company

Urjika Engineering Team7 min read
Read article
BLOG
CNG Stations

CNG Mother Station vs. Online Station vs. Daughter Booster Station

Urjika Engineering Team7 min read
Read article
BLOG
Pipelines

Steel Pipeline vs MDPE Pipeline — Why the Choice Matters More Than You Think

Urjika Engineering Team5 min read
Read article
BLOG
Project Economics

Capital vs Operating Expenditure in a Gas Plant — Why Engineers Must Understand Finance

Urjika Engineering Team5 min read
Read article
BLOG
Gas Pricing

APM Gas vs Market Gas vs HPHT Gas — Why Gas Pricing Confuses Everyone

Urjika Engineering Team6 min read
Read article
BLOG
LPG to CBG

Break Free from LPG Tanker Dependency: Deploy Smart, Mobile Gas Infrastructure

Urjika Engineering Team6 min read
Read article

Have a project like these?

Let’s discuss how we can deliver it for you.