Urjika Consulting & Engineering Solutions Pvt. Ltd. supplied three 4500 WL Type 1 CNG Cascades for a CNG/CBG plant project in Saharanpur, Uttar Pradesh, on 17 December 2025.
Urjika Consulting & Engineering Solutions Pvt. Ltd. supplied three 4500 WL Type 1 CNG Cascades for a CNG/CBG plant project in Saharanpur, Uttar Pradesh, on 17 December 2025.
The project involved supplying multiple gas storage units to support the plant's compressed gas storage requirements. Using appropriately specified cascade equipment is an important part of planning gas infrastructure, with the final arrangement determined by the system design, operating conditions, and intended application.
3 × Type 1 CNG Cascades – 4500 WL Each
Type 1 CNG Cascades use all-metal pressure vessels to store compressed natural gas. They can be incorporated into suitable CNG/CBG infrastructure depending on the project's gas storage and supply requirements.
Each cascade has a nominal water capacity of 4,500 litres, giving a combined nominal water capacity of 13,500 litres across the three units.
Actual gas storage capacity depends on operating pressure, gas temperature, cylinder configuration, and other system conditions.
CNG cascades provide storage capacity within compressed gas systems and can support gas supply arrangements based on the plant's design.
When multiple cascades are supplied for a project, important engineering considerations include:
Matching equipment specifications to the approved system design.
Providing suitable space for installation, inspection, and maintenance.
Ensuring compatibility with associated gas-handling equipment and connections.
Following applicable pressure-vessel, installation, and safety requirements.
Verifying that the installed configuration meets the project's operating requirements.
Engineer In-Charge: Mr. Mohan Lal
The engineer in charge supports coordination of technical requirements and project-related activities. Effective coordination helps align equipment specifications with site needs and supports the planned integration of storage equipment into the overall gas infrastructure.
Project Location: Saharanpur, Uttar Pradesh
Project Date: 17 December 2025
Application: CNG/CBG Plant
Equipment Supplied: 3 Nos. Type 1 CNG Cascades
Water Capacity: 4500 WL per cascade
Combined Nominal Water Capacity: 13,500 WL
Engineer In-Charge: Mr. Mohan Lal
This project highlights the importance of suitable gas storage equipment in CNG/CBG infrastructure development. Supplying multiple cascades requires attention to equipment specifications, site layout, system compatibility, and applicable safety requirements.
The Saharanpur project represents Urjika Consulting & Engineering Solutions Pvt. Ltd.'s contribution to gas infrastructure through the supply of three 4500 WL Type 1 CNG Cascades.
With a combined nominal water capacity of 13,500 litres, the supplied equipment forms part of the project's gas storage infrastructure and reflects Urjika's involvement in supporting India's evolving CNG/CBG sector.
One Partner. Infinite Possibilities.








CASE STUDY
CASE STUDY
CASE STUDYLet’s discuss how we can deliver it for you.