URJIKA · VIA SARTHAK
Civil, structural & piping
Site development, silage pits, three RCC digesters, lagoons, sheds, roads, pipe racks and process piping across the whole plant.

From feedstock to fuel. From concept to commissioning.
End-to-end Engineering, Procurement and Construction (EPC) solutions for Compressed Biogas (CBG) projects — one integrated journey, one project partner.
URJIKA provides end-to-end Engineering, Procurement and Construction (EPC) solutions for Compressed Biogas (CBG) projects, supporting customers from project planning and engineering through equipment procurement, installation, commissioning and project handover.
Our approach integrates biogas purification, compression, CBG storage, gas handling, utilities, automation and associated infrastructure into a complete project solution.
The Urjika model
URJIKA · VIA SARTHAK
Site development, silage pits, three RCC digesters, lagoons, sheds, roads, pipe racks and process piping across the whole plant.
SPECIALIST OEMs
Gas holders, pumps, agitators, choppers, H₂S scrubber and upgrader — selected and integrated by us.
URJIKA · IN-HOUSE
Compressor, cascades, filling posts, HP tubing, odorizer, analyzers, GC and grid-injection skids.
URJIKA · IN-HOUSE
Design, licensing, PESO approvals, erection and commissioning by our own teams with Sarthak’s crews.
Reference 0 TPD CBG plant
0.0%
₹0.00 Cr
Civil, structural & piping — executed by Sarthak
0.0%
₹0.00 Cr
Urjika HP CBG systems, engineering & PESO
0.0%
₹0.00 Cr
Erection & commissioning
0.0%
₹0.00 Cr
Bought-out OEM equipment
Base: ₹0.00 Cr pre-GST — 0 line items of civil, machinery and services, plus E&C and four mobile cascades. Napier + paddy straw + cow dung feedstock.
No aggregator margin on ₹0.0 Cr of in-house scope
In-house scope, 0 TPD plant
₹0.0 Cr
Civil, structures, piping, HP systems, engineering, PESO and E&C — built by our own teams at our own cost.
At 0% margin avoided
≈ ₹0.00 Cr
saved on a 0 TPD plant. Typical EPC players load 0–0% margin on bought-out scope — we take a conservative 0%.
No equipment hire charges passed through.
Cascades, skids and tubing at maker’s cost.
Fewer months of IDC and an earlier first revenue.
What this means for a plant owner
Urjika’s own manufacturing and Sarthak’s own manpower and machinery carry the largest blocks of the plant — so cost stays lean and the schedule stays in our hands.
Urjika’s civil strength · Sarthak Contracts Pvt. Ltd.
₹0.0 Cr
Annual turnover, FY 2023–24 — up from ₹0.0 Cr in FY 2021–22
₹0.0 Cr
Net worth, FY 2023–24 audited
₹0 Cr
Executed for BPCL’s Bargarh bio-ethanol refinery
0 MT
Structural steel erected at Bargarh
Urjika’s civil strength · Sarthak fleet
0
0 m³/hr each
0 + 0
Continuous pours for digester walls
0 + 0
0 m × 0 m tower cranes
0
Site grading, silage pits, lagoons
0 + 0
Internal roads & hardstands
0
Structural & pipe-rack fabrication
0
Plus 0 scaffolding sets
0
On-site concrete QC, 0 MT
Standard OEM equipment
Double-membrane holders, biomethane buffer
Feed, recirculation and transfer pumps; digester mixers
Choppers, macerators, dosing hopper, loader
Water scrubbing or equivalent, from specialist makers
Tube-in-tube exchangers, hot-water generators
Transformer, panels, DG set, fire pumps
The difference: these packages sit on our civil works, connect through our piping and hand over to our HP system — so there is only one interface to manage.
From feedstock feasibility to commissioning — let’s structure your project together.