Reliable gas storage and high-pressure system integration are essential for the safe and efficient operation of CNG and CBG plants. Beyond supplying equipment, successful project execution requires proper tubing installation, equipment interconnection, inspection and commissioning.
Reliable gas storage and high-pressure system integration are essential for the safe and efficient operation of CNG and CBG plants. Beyond supplying equipment, successful project execution requires proper tubing installation, equipment interconnection, inspection and commissioning.
Urjika Consulting & Engineering Solutions Pvt. Ltd. successfully supplied a 4500 WL Type 1 CNG Cascade for a CNG/CBG plant in Surat, Gujarat.
In addition to cascade supply, Urjika undertook the necessary site installation and commissioning activities, including high-pressure tubing and pipeline connections between the relevant equipment.
The work was attended by Mr. Mohan Lal, who supported the site execution activities, equipment interconnection and inspection process.
The project was completed with installation, commissioning and final handover successfully carried out.
The project required the integration of the supplied cascade with the plant's high-pressure gas system.
The major requirements included:
Supply of a 4500 WL Type 1 CNG Cascade.
Connection of relevant equipment through high-pressure tubing and pipelines.
Installation of the necessary fittings and connections.
Inspection of tubing and equipment interconnections.
Completion of commissioning activities.
Final handover of the completed work.
Urjika supplied a 4500 WL Type 1 CNG Cascade, designed for high-pressure gas storage applications.
Type 1 cascades use all-metal cylinders and are widely used in CNG storage and transportation systems.
The supplied cascade was integrated into the plant's gas system through the required high-pressure tubing and equipment connections.
Urjika's scope covered both the equipment supply and the essential site-level activities required to prepare the system for operation.
01. Cascade Supply
Supply of one 4500 WL Type 1 CNG Cascade for the CNG/CBG plant at Surat, Gujarat.
02. High-Pressure Tubing & Pipeline Connections
Execution of the required high-pressure tubing and pipeline work to interconnect the cascade with the relevant plant equipment.
Activities included tubing installation, connection routing and installation of the necessary fittings.
03. Equipment Interconnection
Connection of the cascade and associated equipment to establish the required high-pressure gas flow path according to the project requirements.
04. Inspection
Inspection of the installed tubing, fittings and equipment connections as part of the commissioning process.
05. Installation & Commissioning
Completion of the required installation and commissioning activities to verify system readiness and the functionality of connected equipment.
06. Final Handover
Completion of the project handover following the installation and commissioning work.
Mr. Mohan Lal attended the site and supported the execution of the required work.
The site activities focused on connecting the relevant equipment through high-pressure tubing and pipelines, completing the necessary fitting work, and inspecting the installed connections.
The execution process followed a structured sequence:
Cascade Supply → Tubing Installation → Equipment Interconnection → Inspection → Commissioning → Handover
This approach ensured that the work progressed from equipment supply through the required site integration activities to final handover.
Product supplied: Type 1 CNG Cascade, 4500 WL
Project location: Surat, Gujarat
Application: CNG/CBG Plant
High-pressure tubing: Completed
Equipment interconnection: Completed
Inspection: Conducted as part of site execution
Installation: Completed
Commissioning: Completed
Handover: Completed
Site representative: Mr. Mohan Lal
Integrated Engineering Support
Support covering cascade supply, high-pressure tubing and equipment interconnection.
Site-Level Execution
Dedicated site attendance to complete the required installation and commissioning activities.
High-Pressure System Integration
Proper attention to tubing connections, fittings and inspection requirements.
End-to-End Project Completion
Execution extending beyond equipment supply to commissioning and final handover.
The successful supply and commissioning of the 4500 WL Type 1 CNG Cascade in Surat, Gujarat, demonstrates Urjika's capability to support CNG/CBG plant projects through equipment supply and on-site engineering execution.
From high-pressure tubing and pipeline connections to equipment interconnection, inspection, commissioning and handover, Urjika supported the critical activities required to complete the project.
Beyond Supply. Complete Engineering Execution.
CNG | CBG | CGD | Clean Energy | Engineering | Turnkey Solutions
One Partner. Infinite Possibilities.
CASE STUDY
CASE STUDY
CASE STUDYLet’s discuss how we can deliver it for you.