Site commissioning, high-pressure tubing and equipment interconnection that took a CNG station in Rajkot, Gujarat into operation — with high-pressure tubing works also completed for a station in Gwalior.
A CNG station is only as reliable as the integration between its critical systems. Even when every equipment package is supplied and installed correctly, the high-pressure tubing, interconnections, fittings, panel tubing and commissioning decide whether the station runs safely and reliably.
Urjika executed site commissioning and high-pressure tubing works for CNG station projects. At Rajkot, Gujarat, Urjika deployed dedicated technical manpower for on-site commissioning and system integration, and the station is now operational and running. Urjika also completed high-pressure tubing works for a CNG station at Gwalior.
A CNG station is a set of interconnected systems working at high pressure. Each one had to be connected with the right fittings and routing to make a single, functional station:
Urjika deployed dedicated technical manpower at the Rajkot site. Mr. Mohan Lal of Urjika’s site team carried out the field work — physically connecting and integrating the station’s major systems, and supporting the final commissioning and handover.
The objective was straightforward: connect, test, commission, verify, hand over.
The CNG compressor was connected to the station’s gas system with high-pressure tubing and fittings, with attention to routing and fitting installation.
The LCV filling system was tied into the station’s high-pressure gas network.
The dispenser was connected to the gas supply lines so it receives gas from the upstream system as part of the complete station.
Underground connections between the equipment and station infrastructure, kept organised and functional.
Panel-side tubing and fittings connected to the relevant equipment and instrumentation.
Fitting selection and installation, equipment interconnections, tubing routing and final connection verification.
The connected systems were checked to verify that the equipment works as intended and the station is ready to operate.
Equipment was checked for proper functioning before the work was handed over to the customer’s site team.
The Rajkot CNG station was commissioned with Urjika’s site execution and technical support, and is operational and running.
At Gwalior, Urjika executed the site-level high-pressure tubing needed for station integration and commissioning — further experience in high-pressure tubing, equipment interconnection, fitting installation and commissioning support.
Don’t just supply equipment. Make the system work.









CASE STUDY
CASE STUDY
CASE STUDYLet’s discuss how we can deliver it for you.